Home › Services ›

Parking Lot Installation

Parking Lot Installation in Forney, TX

New parking lots built from bare ground, with layout, grading, drainage, base, paving and striping handled by one crew for businesses, churches, schools and developers.


NEW CONSTRUCTION

Turn Raw Land Into a Working Parking Lot

A new parking lot is often the first thing customers see, and it has to carry traffic, drain properly and meet accessibility standards from day one. HI-TEK Paving handles parking lot installation in Forney and across the eastern Dallas metro for new retail buildings, offices, churches, schools, warehouses and multifamily projects. We start with an empty site and finish with a striped lot that is ready for cars.

Our work covers layout, clearing, grading, drainage, base construction and the final surface. If you already have a lot and simply want it repaved, our parking lot paving service is the better fit. Installation is about building the whole structure correctly from the soil up.

✓ Stall layout and traffic flow planning

✓ Clearing, grading and soil preparation

✓ Storm drainage, inlets and curb lines

✓ Compacted base with asphalt or concrete surface

✓ ADA stalls, ramps, signage and striping

FAMILY OWNED

Black location pin icon on a white background

Forney, TX


WHAT GOES INTO IT

Building Blocks of a New Lot

A parking lot that lasts depends on decisions made long before paving day. These are the pieces we plan and build on every installation.

Layout & Circulation

Stall angles, aisle widths, entrances and fire lanes are arranged so drivers move smoothly and safely.

Grading & Earthwork

Topsoil is stripped and the site is cut, filled and shaped so every area slopes toward drainage.

Drainage Design

Inlets, swales, curb lines and outfalls carry storm water away before it can soften the base.

Subgrade & Base

Clay subgrade is stabilized and topped with compacted base sized for the traffic the lot will carry.

Surface Choice

We pave in hot mix asphalt or reinforced concrete depending on budget, loads and long term plans for the property.

ADA Compliance

Accessible stalls, access aisles, ramps and signs are placed to meet current accessibility standards.

From Bare Ground to Open Lot

Installation moves in a set order, with checks at each stage so problems are caught before they are buried under pavement.

01

Site Review

We study the site plan, soil conditions, elevations and how water moves across the property.

02

Layout & Bid

You receive a detailed proposal covering earthwork, base, surface, striping and schedule.

03

Clear & Grade

Vegetation is removed, the subgrade is shaped and compacted, and drainage lines are set.

04

Build the Base

Base material is placed in lifts and compacted, then proof rolled to find any soft spots.

05

Pave the Surface

Asphalt is laid and rolled, or concrete is formed, poured, finished and jointed.

06

Stripe & Hand Over

Stalls, arrows, fire lanes and accessible markings are painted and the lot opens for use.


What Our Customers Say

08

What Our Customers Say

Reviews

SINCE 2010


Why Choose Us

One Contractor From Dirt to Striping

Splitting a new lot between several trades often means delays and finger pointing. HI-TEK Paving handles the earthwork, base, paving and markings with our own family owned team, led by founder Kevin Rowland since 2010. You get one schedule, one point of contact and a crew that understands how each stage affects the next.

We build lots for small businesses, churches and large commercial developments alike. Call (214) 908-9641 for a free parking lot installation estimate in Forney, Frisco, McKinney, Plano or Terrell.

What Is Parking Lot Installation?

Parking lot installation is the construction of a brand new lot on undeveloped or cleared land. It includes laying out stalls and drive aisles, grading the site, installing drainage, building a compacted base, placing an asphalt or concrete surface, and adding striping, signs and accessible parking. Done right, it creates a lot that drains well and carries traffic for many years.

Asphalt or Concrete for a New Lot?

  • Asphalt: lower upfront cost, quicker to open and easy to patch and reseal. Our asphalt paving crews can place large areas in a short window.
  • Concrete: higher upfront cost but strong under heavy loads and low maintenance; our concrete paving work suits truck courts and dumpster pads.
  • Combination: asphalt for parking stalls with concrete for drive entrances, loading areas and dumpster pads.

How Much Does a New Parking Lot Cost?

New parking lot cost depends on lot size, how much earthwork the site needs, soil stabilization, drainage structures, base thickness, surface material, curbs, accessible features and striping. Sites with poor clay, heavy tree cover or major elevation changes cost more to prepare. A detailed site review gives you a realistic number before work begins.

Planning Stall Layout and Traffic Flow

Good layout balances capacity with safe movement. Angled stalls with one way aisles suit tight retail sites, while ninety degree stalls with two way aisles maximize count on wider lots. We plan clear entrances, fire lanes, walking routes to the building and room for delivery trucks. Accessible stalls go closest to the entrance with a level route to the door. We also think ahead about future phases, so a lot built today can be extended later without tearing out new pavement or rerouting drainage.

Installation Steps, in Order

  1. Confirm site plan, elevations and utility locations.
  2. Clear, strip topsoil and rough grade.
  3. Install storm drainage and curb lines.
  4. Stabilize subgrade and compact base in lifts.
  5. Pave the surface and allow it to cure.
  6. Apply parking lot striping and signage.

Where We Build New Lots

We install new lots in Forney and fast growing communities such as Frisco and McKinney plus Plano and Terrell.

Why Do New Parking Lots Fail Early?

New parking lots fail early when the subgrade is not stabilized, the base is too thin for the traffic, or water has nowhere to go. In North Texas, building directly on untreated expansive clay is the most common cause. The surface may look fine at opening, then crack and sink within a few seasons as the soil moves underneath.

Building on Blackland Prairie Clay

Clay around Forney swells after rain and shrinks in drought. We address it by removing organic topsoil, treating or stabilizing the subgrade where the soil calls for it, compacting at the right moisture, and grading so water drains away from pavement edges. These steps add cost upfront but protect the lot from the heaving and cracking that lead to early parking lot repair bills.

Drainage Choices That Matter

  • Cross slope: every area slopes so water never sits in a stall.
  • Inlets and storm lines: collect runoff and carry it to an approved outfall.
  • Curb and gutter: channel water and protect pavement edges.
  • Detention: some sites need a pond or underground storage to control runoff.

Drainage is the single biggest factor in how long a new lot lasts in this region. We follow the engineered grading plan closely and check elevations as we build, because a low spot only a fraction of an inch deep can hold water against the asphalt after every storm and slowly weaken the base below it.

Accessibility From Day One

New lots must include the right number of accessible stalls, van accessible spaces, access aisles, curb ramps and signs. Slopes in those areas must stay nearly flat. Getting this right during installation is far cheaper than tearing out and repouring later, and it gives every visitor a safe path from car to door.

Protecting Your New Lot

Fresh asphalt should get its first seal coating after it cures, usually within the first year or two, and cracks should be sealed as soon as they appear. A scheduled parking lot maintenance plan keeps striping bright and drainage clear. If grading needs to happen well ahead of paving, our site preparation team can start early. Talk with our team about your site and timeline.


Common questions

Frequently Asked Questions

Answers to common questions about new parking lot installation, layout, drainage and accessibility in Forney and the DFW area.

    How long does it take to install a new parking lot?

    Small lots can be finished in a couple of weeks, while larger commercial sites with drainage and concrete work may take several weeks or more. Weather and soil conditions affect earthwork, so we give you a schedule with clear milestones.


    Do I need permits for a new parking lot?

    Most cities require site plan approval and permits for new parking areas, especially for drainage and accessibility. We work from your approved civil plans and coordinate inspections with your engineer or general contractor.


    How thick should a new asphalt parking lot be?

    Thickness depends on traffic and soil. Car parking areas need less than drive lanes and truck routes, which get thicker asphalt and base. We size each area for its actual loads rather than using one thickness everywhere.


    How many accessible parking spaces does my lot need?

    The number is based on total stall count under federal accessibility standards, with at least one van accessible space. We lay out the required stalls, aisles and signs as part of the installation.


    Can you install a parking lot for a church or small business?

    Yes. We build lots of every size, from a few dozen stalls behind a small office to large retail and church campuses, and we scale crews and equipment to the project.


    How do I start planning a new parking lot?

    Call (214) 908-9641 or send us your site plan. We will review the property, answer questions and provide a free, detailed installation estimate.